跳到主要内容

火灾天气预报

喀斯喀特西部和东部的斜坡已经发布了阵风和雷暴的红旗警告。作为 PSE 野火安全操作的一部分,我们开启了对这些区域目标线路上的潜在危险更加敏感的系统设置

增强型电力线设置旨在帮助您确保安全,但它们可能会导致计划外停电。

这不是公共安全停电 (PSPS),我们会在恶劣天气来临之前主动关闭电源。

我们了解意外中断可能对客户产生的影响,因此我们为急救人员和运营中心增加了人员配备。

欲了解更多信息或报告停电,请访问 PSE 的停电地图

由于我们地区发生多起野火,许多地区的空气质量处于不健康的范围内。野火烟雾会严重影响健康,尤其是对高危人群而言。要了解有关如何保护自己和他人的更多信息,请访问华盛顿州卫生部关于避免吸烟的页面。

alert

安全第一。切勿触摸或进入距离坠落的电力线 35 英尺以内,因为它们可能会通电。

致电 1-888-225-5773 或 911 致电 PSE 报告问题。

在线报告和跟踪停电情况

  • 在线停电报告:pse .com/outage
  • 停电地图:pse.com/outagemap
  • PSE 移动应用程序:ps e.com/app
  • 有关一般停机信息,请参阅:pse .com/advisories
  • 有关停电准备小贴士,请参阅:pse .com/storm
  • Skagit and Whatcom County electric system upgrades

    Phase D

    • Lake Samish Park to Bellingham (6 miles)

    We expect to begin working on this segment in spring 2026. Check back for project updates or contact us with questions.

    Sedro Woolley

    Project overview

    To increase electric reliability for customers in Skagit and Whatcom counties, we are rebuilding and reconductoring approximately 25 miles of existing transmission and distribution lines between Bellingham and Sedro Woolley.

    Currently, the local electric system is prone to power outages due to limited capacity and aging infrastructure. The existing poles and conductors (wires) were built in the early 1960s and need to be replaced. Rebuilding these transmission and distribution lines with new, higher capacity wire and replacing the poles will strengthen the current system and reduce the frequency of outages for our customers in the area.


    The overall project work will be completed in phases

    All phases of this project include replacing the existing structures with new wood poles and new, higher capacity 115 kV transmission wire. It also includes replacing distribution wire as needed.

    Phase A: Complete 2017
    Alger to Belfast (4 miles)

    Phase B: Complete 2018
    Prairie Road near Belfast to the Norlum substation in Sedro Woolley (7.5 miles)

    Phase C: Complete 2025
    Lake Samish Park to Alger transmission line (6 miles)

    Phase D: Upcoming spring 2026
    Lake Samish Park to Bellingham (6 miles)

    Phase E: TBD
    Bellingham substation (0.5 miles)
    Norlum substation to Sedro Woolley substation (0.5 miles)