跳到主要内容

火灾天气

预计华盛顿东部,包括基蒂塔斯山谷,周末将出现温暖、干燥和多风的天气。

作为PSE野火安全行动的一部分,我们将开启受影响地区的系统设置。这些设置对潜在危险(例如树枝接触电力线)更加敏感,只要存在高野火风险条件,它们就会保持原

状。

增强型电力线设置旨在帮助您确保安全,但它们可能会导致计划外停电。这不是公共安全停电,我们会在恶劣天气来临之前主动关闭电源

欲了解更多信息或报告停电,请访问 PSE 的停电地图

alert

安全第一。切勿触摸或进入距离坠落的电力线 35 英尺以内,因为它们可能会通电。

致电 1-888-225-5773 或 911 致电 PSE 报告问题。

在线报告和跟踪停电情况

  • 在线停电报告:pse .com/outage
  • 停电地图:pse.com/outagemap
  • PSE 移动应用程序:ps e.com/app
  • 有关一般停机信息,请参阅:pse .com/advisories
  • 有关停电准备小贴士,请参阅:pse .com/storm
  • 工业战略能源管理


    Build a trained energy team, earn incentives

    Our Industrial Strategic Energy Management (ISEM) program provides the training and tools you need to develop your own on-site energy-management team, as well as incentives for energy savings and achievement of program milestones. It's a holistic, cohort-based program focused on organizational culture and employee engagement with an emphasis on low- and no-cost projects.

    Case studies

    Check out the carousel at the bottom of this page to see more case study videos. You can also read even more in our case study library about the successes our ISEM customers have had.

    Puyallup Water Pollution Control Plant

    Since joining PSE’s ISEM program in early 2021, Puyallup Water Pollution Control Plant has cut more than $50,000 of annual energy costs with low- and no-cost changes they learned in a cohort with industry peers.



    What you get

    If you qualify for our ISEM program, you’ll receive:

    • Training through five or six workshops for an energy team comprised of employees from different groups at your organization.
    • An onsite energy assessment event to identify energy-saving opportunities, including engineering support from PSE.
    • Energy performance tracking tools to track progress and document savings at your site.
    • An organizational energy-management assessment to understand where your organization is in its energy-management process and where improvements can be made to sustain strategic energy management at your site.
    • Annual incentives over three performance years for verified site-level energy savings associated with process improvements, behavioral changes, and operations and management changes implemented throughout your industrial site. We also offer two milestone incentives for achieving key program criteria. Current incentive rates are listed below.

    Year 1 incentive schedule
    Performance incentive
    Electric$0.04 per kWh saved
    Natural gas$0.64 per therm saved
    RebateUp to $50,000

    Milestone incentive #1
    Earn this one-time incentive when your business provides production data needed to develop a site energy model.
    Rebate$1,000

    Milestone incentive #2
    Earn this one-time incentive when you demonstrate employee engagement efforts and start working on energy-saving measures.
    Rebate$1,000


    Year 2 and 3 incentive schedule
    Performance incentive
    Electric$0.04 per kWh saved
    Natural gas$0.64per therm saved
    RebateUp to $50,000


    How you qualify

    To be eligible for our ISEM program:

    • Your business site must be within PSE's electric and/or gas service area.
    • Your business site must be considered industrial, which often (but not always) means either: the majority of its electric load is associated with processing or manufacturing; or, its subsystems maintain long run-hours, rely on industry-standard technology, and keep relatively stable control set points and loads.
    • Sites whose principal use is office or retail are almost always not eligible for this program.
    • Buildings targeted in your ISEM portfolio must collectively use greater than 3,000,000 kWh or 150,000 therms (or a combination of both) annually.
    • You must assign and commit existing staff members as your executive sponsor, energy champion and data lead. These people form the core energy team at the site and act as liaisons between your business and PSE. This team is responsible for completing program deliverables and tasks, communicating energy-saving initiatives to your staff, and managing your site's energy bills.

    How you apply

    To get pre-approved, complete the online custom grant application.


    Custom O&M project incentives

    There are also incentives available to pay and support operation and maintenance (O&M) implementation which require internal and external labor and materials within your facilities. Please refer to our Industrial Custom Capital Grants program for more details about custom O&M grants.





    Questions? Get in touch with us at industrialem@pse.com.


    business energy resources ISEM
    Ask an Energy Advisor

    如需个性化建议,请通过 industrialem@pse.com 与 PSE 的工业团队联系。

    或者致电 1-800-562-1482 致电 PSE 能源顾问。

    Resources
    Case studies

    Conagra Brands: Read how this manufacturing facility got employees on board to help trim $36k in energy costs.


    Advanced Drainage Systems: Find out how ADS manufacturing facility saved $76k with low/no cost improvements, replicable across sites.


    Puyallup WPCP: See how a wastewater treatment plant in Puyallup saved more than $50k in energy costs.