贝克河水力发电项目

贝克会发生什么?

Warning
贝克河俱乐部会所访客和口译中心的开放时间为周三至周日的上午 10:00 至下午 5:00,直至 9 月。工作人员可以通过下面列出的电话号码来解答问题。

如果你有任何问题,请发送电子邮件至 culturalresources@pse.com 或致电 1-88
8-404-8773。
  • 现代化和安全工作

    为了确保下贝克大坝运营的持续公共安全和可靠性,PSE于2020年初2021年底开始了大坝的安全和现代化工作,为期约五年。随着这项工作进入动员阶段,混凝土社区的建筑交通量将增加。有关这项工作的更多信息,请参阅 2021 年底邮寄给社区的通知,其中详细说明了施工进度

     

  • Overview

    The Baker River Hydroelectric Project is PSE’s largest hydropower facility. The power project is located on a tributary of the Skagit River in northwest Washington and includes two concrete dams and their associated powerhouses and facilities.

    Upper Baker Dam:

    • Completed in 1959
    • 312-foot-high concrete gravity dam
    • 107 megawatts of power-generating capacity

    Lower Baker Dam:

    • Completed in 1925
    • 285-foot-high concrete arch dam
    • 111 megawatts of power-generating capacity

    The Baker River Hydroelectric Project covers almost 300 square miles in Washington state. Several entities own land within the Baker River basin, including the U.S. Forest Service, the National Park Service, the Washington State Department of Natural Resources, and PSE.

    The project reservoirs, Baker Lake and Lake Shannon, are fed by runoff from the flanks of Mount Baker and Mount Shuksan. They create more than 7,203 acres of water surface that provides public recreation, fisheries, flood risk management, and hydropower benefits for the communities in the Skagit River Valley and the greater Northwest.

    We also operate extensive salmon-enhancement systems within the power project, including a fish hatchery and innovative facilities for moving migrating fish both upstream and downstream around PSE's two dams.

  • Early-warning siren system

    We comply with strict federal regulations to ensure public safety while operating the dams.  We developed a comprehensive Dam Safety Program and were awarded a 50-year federal operating license for the power project in October 2008.

    As part of our Dam Safety Program and Emergency Action Plan, we upgraded the early-warning siren system in 2018. The upgrade increased the sound coverage area, taking the system from three sirens to eight. Learn more about our commitment to public safety here.

    We test the sirens on the second Monday of every month at 6:00 p.m. The sirens sound for less than one minute during the test. To hear the siren messages and tone, download the audio files below:

    Early Warning System

  • 香农湖日间公园

    香农湖游艇发射场的新公共日间使用公园现已向公众开放。新公园设有扩建的停车位、洗手间、野餐桌、木炭烧烤和带顶棚的野餐庇护所供公众享用。该项目帮助PSE满足联邦能源监管委员会(FERC)的要求,这是贝克水力发电项目许可协议的一部分

    该公园的开放时间为每年的4月15日至10月31日。公园的开放时间是从黎明到黄昏。目前,PSE 不接受野餐避难所的预订,先到先得。有关公园的问题和疑虑,请联系重大项目热线:

    A woman and man perform a ribbon cutting ceremony with people gathered around picnic tables under an open air shelter by Lake Shannon in rainy weather.

    照片:PSE Baker水力发电项目经理帕梅拉·斯纳维利(左)和PSE咨询资源科学家托尼·福克斯在香农湖日用公园新开幕庆典上剪彩。

    托尼·福克斯,公园经理
    1.888.404.8773

    major.projects@pse.com

     

贝克河俱乐部会所访客和口译中心

贝克河俱乐部会所访客和口译中心于2021年进行了翻新,提供有关PSE的使命、水力发电项目及其设施以及该地区的文化和自然资源的信息。

历史保护学家、考古学家和文化资源专家与社区、政府和部落利益相关者合作,开发了尊重原始会所特色和历史的设计。更新后的俱乐部会所将成为游客在未来几年内享受的地方。

营业时间:
五月的第一个星期三至九月的最后一个周末
周三至周日
上午10点至下午5点

之前和之后

The new Baker River Visitor and Interpretation Center

Ribbon cutting ceremony at Baker River Visitor and Interpretation Center

照片:(从左至右)PSE Baker水力发电项目经理帕梅拉·斯纳弗利、来自上斯卡吉特印第安部落的里克·哈特森、混凝土市长杰森·米勒和PSE发电副总裁罗恩·罗伯茨在华盛顿州混凝土的盛大开幕式上剪彩。