Skagit and Whatcom counties electric system upgrades


Phase E

  • Transmission line to Bellingham substation (0.5 miles)
  • Norlum substation to Sedro Woolley substation (0.5 miles)

We anticipate beginning construction on Phase E in spring 2027. Check back for project updates or contact us with questions.

 

Approximate construction route for Phase E

Norlum and Bellingham substation

Project overview

To increase electric reliability for customers in Skagit and Whatcom counties, we are rebuilding and reconductoring approximately 25 miles of existing transmission and distribution lines between Bellingham and Sedro Woolley.

Currently, the local electric system is prone to power outages due to limited capacity and aging infrastructure. The existing poles and wires were built in the early 1960s and need to be replaced. Rebuilding these transmission and distribution lines with new, higher capacity wire and replacing the poles will strengthen the current system and reduce the frequency of outages for our customers in the area.


The overall project work will be completed in phases

All phases of this project include replacing the existing structures with new wood poles and new, higher capacity 115 kV transmission wire. It also includes replacing distribution wire as needed.

Phase A: Completed 2017
Alger to Belfast (4 miles)

Phase B: Completed 2018
Prairie Road near Belfast to the Norlum substation in Sedro Woolley (7.5 miles)

Phase C: Completed 2025
Lake Samish Park to Alger transmission line (6 miles)

Phase D: Completed 2026
Lake Samish Park to Bellingham (6 miles)

Phase E: TBD Spring 2027
Transmission line to Bellingham substation (0.5 miles)
Norlum substation to Sedro Woolley substation (0.5 miles)